Old River Control

One of the most important modifications to the project was made in 1954 when Congress authorized the feature for the control of flow at Old River to prevent the capture of the Mississippi by the Atchafalaya River.

The first two features completed were the low-sill and overbank structures, the former to pass low and medium flows from the Mississippi to the Atchafalaya River in a controlled manner, and the latter to  pass flood flows to the Atchafalaya in conformance with the flood control plan. Inflow and outflow channels were constructed connecting the low-sill structure with the Mississippi and Red-Atchafalaya rivers. A third facility -- called the Auxiliary Structure -- was placed in service late in 1986.