Results:
Tag: Red River
Clear
  • UPDATE to Lindy C. Boggs Lock and Dam closure schedule

    VICKSBURG, Miss. – The U.S. Army Corps of Engineers (USACE) Vicksburg District will temporarily close Lindy C. Boggs, Lock and Dam (L&D) to navigation on the Red River during two separate periods, Aug. 30–Sept. 28 to dewater the upstream gate and Oct. 14–Nov. 12 to dewater the downstream gate.
  • USACE Vicksburg District to close Lindy C. Boggs Lock and Dam

    VICKSBURG, Miss. – The U.S. Army Corps of Engineers (USACE) Vicksburg District will temporarily close Lindy C. Boggs, Lock and Dam (L&D) to navigation on the Red River during two separate periods, Aug. 15 – Sept. 15 to dewater the upper gate and Oct. 1 – 30 to dewater the lower gate. The lock will temporarily reopen on approximately Sept. 16 and remain open for 15 days to allow traffic to pass. During the dewatering’s of the upper and lower gate bays, the district will make repairs, inspect the structure, and plan for future maintenance.
  • Fargo-Moorhead diversion project receives $437 million in Infrastructure Investment and Jobs Act plan

    ST. PAUL, Minn. – The U.S. Army Corps of Engineers, St. Paul District, received $437 million to complete work on the Fargo-Moorhead Metropolitan Flood Risk Management Project in the Infrastructure Investment and Jobs Act, or IIJA, Plan released today.