Lock and Dam 5A dewatering
Kris Taverna, left, and Dale Rud, both of operations, work to remove damaged concrete from the lockwall at Lock and Dam 5A on January 15, 2015. Lock 5A was closed to navigation on Dec. 1, 2014, in order to complete the necessary work by March 9, 2015.

Download Image: Full Size (0.91 MB)
Tags:
Photo by: George Stringham |  VIRIN: 150115-A-GX971-931.JPG